Nuffnang

Showing posts with label Add Math Project 2010. Show all posts
Showing posts with label Add Math Project 2010. Show all posts

Monday, May 28, 2012

Additional Mathematics Project Work 1-2012 / 2012 Kerja Projek 1 Matematik Tambahan



Additional Mathematics Project Work 1-2012 / 2012 Kerja Projek 1 Matematik Tambahan
Additional Mathematics Project Work 2012
.
Add MathProject Work 1-2012 / 2012 Kerja Projek 1 Matematik Tambahan
Additional Mathematics Project 2012
.
Additional Mathematics Project Work 2012 - Part 1
Add Math Project 2012
.
Additional Mathematics Project Work 2012 - Part 2
.
Add Maths (Additional Mathematics) Project Work 1 2012 / Kerja Projek (Kursus) 1 Matematik Tambahan 2012

(Further Exploration dalam Bahasa Melayu)

91371477-Add-Maths-Project-Work-1-2012
.
 Additional Mathematics Project Work 1 2012 / Kerja Projek (Kursus) 1 Matematik Tambahan 2012
Add-Maths-Project-Work-1-2012( english)
.
Add Math Project Work 1 2012 / Kerja Projek (Kursus) 1 Matematik Tambahan 2012
Kerja Kursus Add Math
.


Kerja Projek Matematik Tambahan 2012 – Bahagian 1
Kerja Projek Matematik Tambahan 2012 – Bahagian 2
Additional Mathematics Project 2012 – Question 1

all source from bumigemilang

Friday, June 11, 2010

Add Math Project 2010 Answer (Worksheet 1)

Tugasan_1_1

Further Exploration
(a)(i) Structure 1

image
(ii) Structure 2

image

image

image

(iii) Structure 3

image

image

image

(iv) Structure 4

image

image

image

Conclusion
Structure 4 will cost the minimum to construct


a(ii)
As the president, I will choose structure 4 so that I can minimize the construction cost.

B(i)

image

(b)(ii)
Area to be painted
3, 2.9375, 2.875, ......., 2.5
This is an Arithmetic Progression (AP) with
common difference, d = 2.9375 - 3 = -0.0625 (or 2.875 - 2.9375 = -0.0625)
When k increases by 0.25m, the area to be painted decreases by 0.0625 m

(c)

image

When

image

The shape of the concrete is a rectangle with length 4m and breadth 0.5m.